Abstract

Cost engineering is the discipline of deliberately managing product cost. Value Analysis (VA) examines an existing product for cost reduction; Value Engineering (VE) builds the cost discipline into new designs. Both use a systematic approach: identify function, eliminate non-functional cost, substitute equivalent lower-cost components, simplify assembly.

Section 1 covers target costing fundamentals. Section 2 covers cost structure analysis. Section 3 covers VA/VE methodology. Section 4 covers BoM optimisation techniques. Section 5 covers design-for-cost (DFC) rules. Section 6 covers cost-reduction examples.

01 Concept Intent Constraints 02 Design CAD · PCB DFM review 03 Prototype Test plan Iterate 04 Source RFQ · BOM Contract 05 Sample Golden Approval 06 Produce QC · cert Ramp 07 Ship Freight Customs HARDWARE PRODUCT DEVELOPMENT — 7-STAGE PIPELINE PHASE 1 · DEFINE PHASE 2 · BUILD PHASE 3 · PRODUCE PHASE 4 · DELIVER
Cost engineering runs across the lifecycle — most cost is locked in during Phase 2 (Build) at design freeze. Late changes are 10-100× more expensive than early ones.

1.Target costing fundamentals

Target costing is "design to a price" — set the unit cost target at concept and design backwards from there.

1.1The target cost equation

``` Target unit cost = Target retail price ÷ Channel markup multiplier − Variable cost premium (warranty, returns) − Selling, general, and admin (SG&A) − Marketing reserve − Profit target

Example: Target retail price: $100 (premium DTC product) Channel multiplier: 2× (DTC) Target unit revenue: $50 Less SG&A: $5 Less marketing: $10 Less warranty reserve: $3 Less profit (20%): $10

= Target unit cost (COGS): $22 ```

1.2Channel multipliers (recap)

ChannelMultiplierNotes
Direct-to-consumer2.0-2.5×Lowest channel cost
Amazon marketplace2.5-3×Add fulfilment fees
Specialty retail3-4×Distributor + retailer margin
Mass retail4-5×Walmart, Target
Premium / luxury5-10×Channel + brand premium

1.3Working backwards from price

Retail priceMass retailSpecialtyDTCTarget COGS (DTC)
$50$10$13$20$7
$100$20$25$40$18
$200$40$50$80$40
$500$100$125$200$90
$1 000$200$250$400$180

1.4Cost lock-in timing

Cost is largely set by the time mechanical CAD is complete:

  • Concept stageProcess selection, material choice, complexity. ~90 % of cost.
  • Detailed designSpecific components, tolerances. ~95 % of cost locked in.
  • Pre-productionFinal supplier negotiations. ~98 % cost locked.
  • Mass productionVolume + experience curve reduces cost by 5-15 % over time.

Wait until design freeze to think about cost = "redesigning" the product. Front-load.

2.Cost structure analysis

Before reducing cost, understand where it is. Break down the BoM and process to identify opportunities.

2.1Cost breakdown framework

For a typical consumer electronic product (~$30 COGS):

Category% of COGSExamples
Electronics (PCBA)35-45 %MCU, sensors, ICs, passives, PCB
Mechanical (enclosure)20-30 %Plastic parts, fasteners, mechanical
Battery10-15 %Cells, BMS, protection
Display / screen0-15 %If applicable
Cables + connectors5-10 %USB, internal cables
Packaging3-7 %Color box, inner trays
Labels / printing1-3 %Stickers, manual
Assembly labor8-15 %Per-unit labor
Test + QA2-5 %Functional test, sampling
Logistics / overhead5-10 %Factory overhead, freight to dock

2.2Pareto analysis on BoM

Apply 80/20 rule to BoM:

  • Top 5-10 line items typically = 60-80 % of BoM cost.
  • These are your A-parts; focus cost reduction here.
  • B and C parts have less leverage; don't waste effort below the threshold.

2.3Cost driver analysis

For each major cost category, identify the driver:

Cost driverExampleLever to reduce
Component countMore parts = more assembly + inventoryCombine features
Tolerance classTighter = higher costLoosen non-critical
Material gradePremium polymer = +20-50 % vs. commodityMaterial substitution
Surface finishSPI A1 vs. SPI B3Lower finish where invisible
Tooling complexityMore slides, undercuts, multi-cavitySimpler geometry
Process choiceInjection mold vs. CNCVolume-matched process
Custom vs. standard partCustom = NRE + lead timeStandard alternative
Single-sourceNo negotiation leverageDual-source

3.VA / VE methodology

Value Analysis (VA) is applied to existing products. Value Engineering (VE) is applied to new designs. Both use the same 5-step methodology.

3.1The 5-step VA/VE process

1. Information phase — Gather full BoM, drawings, specs, supplier costs, function tree. 2. Function analysis phase — For each component, ask: "What does it DO?" Express each function in 2 words (verb + noun). 3. Creative phase — Brainstorm alternatives to provide the same function. No critique yet. 4. Evaluation phase — Score alternatives on: function preservation, cost, quality, feasibility, time. 5. Implementation phase — Engineering changes (ECNs), supplier negotiations, ramp.

3.2Function analysis (FAST diagram)

For each component, ask: "What does this DO?" and "How is it done?" Build a tree:

`` Provide light ← Primary function (why the product exists) ↓ Emit visible photons ← Basic function ↓ Convert electrical to light ← Required function ↓ LED ← Current solution ↓ Phosphor + driver + heatsink ← Sub-functions ``

For each level, ask: is this function necessary? Is there a cheaper way?

3.3VA/VE substitution checklist

  • Different materialSame function, lower cost (PC → PC+ABS, brass → zinc).
  • Different componentSame function, different MPN (premium → generic equivalent).
  • Standard vs. customOff-the-shelf vs. custom; standard usually wins below 50k volume.
  • Multi-function consolidationOne part doing two jobs (overmold replaces two parts).
  • Process changeCNC → casting → injection mold per volume.
  • Outsourcing decisionIn-house vs. supplier specialisation.

4.BoM optimisation techniques

Specific tactics to reduce BoM cost.

4.1Component consolidation

  • One regulator instead of twoIf acceptable voltage drop, use single regulator with branched output.
  • Shared decoupling capsOne 10 µF + multiple 100 nFs serves the whole board (per power-rail bank).
  • Standard resistor valuesReduce variant count; supplier discount on volume.
  • Common connector typesOne USB-C, one barrel, eliminate proprietary.

4.2Material substitution

  • PC + ABS instead of pure PCSlightly lower clarity + slightly lower cost.
  • Glass-filled vs. unfilled polymerHigher strength + slight cost increase, often net reduction in part wall.
  • Generic equivalent ICsMicrochip vs. ATmega; second-source as direct substitute.
  • Recycled plastic where cosmetic + structural allow10-30 % savings + sustainability story.

4.3Tolerance relaxation

  • Critical features tight (±0.05 mm)Tolerance budget on critical mating.
  • Non-critical features loose (±0.3 mm)Process-capable tolerance.
  • Cumulative tolerance budgetSet per assembly stack-up.

4.4Process change examples

FromToSavingsVolume crossover
CNC (5-axis)Injection molded plastic50-90 %1k-5k units
Injection mold (4-cavity)Family mold + multi-cavity30-50 %50k-200k units
Sheet metal stamping (single die)Progressive die40-70 %50k+ units
Hand assemblySemi-automated30-60 % labor10k+ units per month
Manual SMT (selective solder)Reflow oven60-80 %1k+ units per shift

4.5Geometric optimisation

  • Reduce wall thickness where not structurally required (saves material + cooling time).
  • Reduce part count through snap-fits, living hinges, overmolds.
  • Standardise screwsOne size, one drive type per assembly.
  • Reduce cable harness complexityInternal PCB connections vs. cables.

5.Design-for-cost rules

Tactical rules engineers apply during design to keep cost down.

5.1Mechanical DFC rules

  • Plan for high-volume process at design timeDon't design for 5-axis CNC if volume justifies injection molding.
  • Single material per partMulti-material parts require multi-shot molding or assembly.
  • Snap-fits over screwsEach screw = 3-8 s assembly time + screw cost.
  • Self-aligning featuresAsymmetric mating prevents misorientation = faster assembly.
  • Standard fastener sizesM2.5, M3 for most consumer hardware.
  • Minimum draft angles1-2° (smooth), 3-5° (textured).
  • Minimum wall thickness1.5-3 mm for most polymers.

5.2Electronics DFC rules

  • Use largest acceptable component package0603 over 0402 except where space-constrained.
  • Standard 2-layer or 4-layer FR-4Avoid 6+ layer or HDI when possible.
  • Lower copper weight1 oz (35 µm) over 2 oz (70 µm) for non-power layers.
  • Minimise via countEach via adds drill cost.
  • Avoid blind/buried viasAdd 2-5× cost vs. through-holes.
  • Standardise component packagesFew package variants; supplier discount on volume.

5.3Assembly DFC rules

  • Fewer parts = less assembly timeEach part needs picking, placing, joining.
  • Visual orientation cuesOperator doesn't need to verify orientation = less time.
  • Linear assemblyTop-down or one-direction stacking; minimal flipping.
  • Fewer tools per stationOne screwdriver type, one connector type.

6.Cost reduction examples

Real examples of cost reduction in consumer hardware.

6.1Example 1: Bluetooth speaker

Original BoM cost: $14.50 After VAVE (Year 1):

ChangeSaving
Combined display + button PCB (was 2 boards)$1.20
Single 8 Ω driver instead of dual (same SPL)$0.85
Snap-fit instead of 6 screws$0.30
Standard barrel jack instead of USB-C (DC-only model)$0.70
Reduced packaging (litho sleeve instead of color box)$0.45
Total saving$3.50 (24%)
New cost$11.00

6.2Example 2: Soil moisture sensor

Original BoM cost: $8.80 After VAVE (Year 2):

ChangeSaving
Generic equivalent MCU (different vendor)$1.10
Removed RTC IC (firmware uses MCU's internal clock)$0.40
Eliminated LDO (direct-drive MCU from battery)$0.30
Reduced battery from 2 000 mAh → 1 000 mAh (firmware optimised)$0.90
Simpler housing (eliminated snap-fit detail)$0.50
Total saving$3.20 (36%)
New cost$5.60

6.3Example 3: Smart watch

Original BoM cost: $42.00 After VAVE (Year 1.5):

ChangeSaving
Lower-grade OLED (same resolution, cheaper supplier)$5.50
Battery cell substitution (different chemistry, similar capacity)$2.20
Combined accelerometer + gyro (single 6-DoF IMU instead of two)$1.80
Simplified strap connector (proprietary → standard)$1.20
Reduced premium PVD coating to anodise$1.50
Total saving$12.20 (29%)
New cost$29.80

6.4When NOT to reduce cost

  • Safety-critical componentsBattery protection, ESD diodes, fuses.
  • Brand-essential featuresThe thing that makes customers buy.
  • Compliance-criticalSubstance restrictions, certifications.
  • Single-source long-leadWhere supply security trumps cost.
  • Cosmetic where the user touchesPremium materials on contact surfaces matter.
Final note.cost engineering is engineering. The same discipline that delivers a high-quality product also delivers a cost-target product. Both must be in scope from day one. A 30 % cost reduction discovered at year 2 means a year of unprofitable shipping; the same reduction designed in from the start means a viable product at launch.